Eskom Chief Operating Officer, Jan Oberholzer, says Eskom may be forced to increase load shedding from Stage 3 load shedding to Stage 4 if the power utility fails to gather enough generation capacity to feed national peak demand.
According to Oberholzer, Eskom suffered at least eight major breakdowns at its power stations – exacerbating strain on the already fragile and constrained power system.
Click here to read more.
Photo: Unsplash




